OWNER NAMECLIENT NAMEPROJECT DESCRIPTIONSCOPE OF WORKSTATUS
Ma’aden Phosphate Company (MPC)Ma’aden Phosphate Company (MPC)Modification of Pre-Scrubber VesselReplacement of Damaged Shell Portion of Granulator Pre-Scrubber Vessel 8A61-V06 with 904-L Material including Supply of material & fabrication of Shell for DAP Train-AUNDER EXECUTION
TASNEE Petrochemical ComplexTASNEE Petrochemical ComplexMAPD C3 De-Inventory LineMechanical, Piping & Instrumentation Work covering Supply of Material, Fabrication & Installation of Piping, Pipe Supports, Structural Platform, Cable Trays, Radiography, Blasting & Painting and Insulation & Hydro-testingUNDER EXECUTION
Saudi International Petrochemical Co. (SIPCHEM)Saudi International Petrochemical Co. (SIPCHEM)BUYLT ACETATE (BA) Tank (82-TK4201) AT SABTANKHydro-jetting, Cleaning, Repair & Inspection works of BA Tank. The SOW including Isolation, inspection / NDT, Roundness Test of shell courses, Hydro-test of Tank, Inspection of CP & Internal Floating Roof including Scaffolding & Commissioing TankUNDER EXECUTION

Shutdown & Specialized Services

OWNER NAMECLIENT NAMEPROJECT DESCRIPTIONSCOPE OF WORKSTATUS
Saudi Basic
Industries Corp.
(SABIC)
Saudi Basic
Industries Corp.
(SABIC)
Master Framework
Agreement for
Turnaround &
Emergency Shutdown
Services (2017 –
2022)
Long Form Master Framework Agreement for
providing of Turnaround & Emergency
Shutdown Services in SABIC Affiliates in
Jubail & Yanbu
ONGOING
Saudi Basic
Industries Corp.
(SABIC)
Saudi Basic
Industries Corp.
(SABIC)
Master Framework
Agreement for Plant
Support Services
(2017 – 2022)
Long Form Master Framework Agreement for
providing of Plant Support Services in SABIC
Affiliates
ONGOING
Saudi Arabian
Mining Co.
MA’ADEN
Saudi Arabian
Mining Co.
MA’ADEN
Framework Service
Agreement For
Hydro-Jetting /
Industrial Cleaning
(2017 – 2021)
Provision of Services for Hydro-Jetting and
Industrial Cleaning for 5 (3+ 2) Years
ONGOING
Ma’aden Wa’ad
Al-Shamal
Phosphate Co.
(MWSPC) –
TURAIF
Ma’aden Wa’ad
Al-Shamal
Phosphate Co.
(MWSPC) –
TURAIF
Long Form 2 Years
Contract
Long Term Contract for Maintenance &
Servicing of Repairable Spares Including
Valves, Pumps etc.
ONGOING
SAHARA
Petrochemicals
SAHARA
Petrochemicals
Long term Contract
(4 Years Contract
2015 – 2018)
Providing 24/7 Operation & Maintenance
Support in SAMAPCO Plant
ONGOING
Tasnee
Petrochemical
Complex
Tasnee
Petrochemical
Complex
Long Term Contract
(3 Years 2016 – 2018)
Condition Monitoring & Maintenance of
Rotating Equipment
ONGOING
SABIC TERMINAL
SERVICES CO. –
SABTANK
SABIC TERMINAL
SERVICES CO. –
SABTANK
North Piping Circuit
Project
Procurement, Replacement, Repair, Realign
& testing of Pipelines, associated Supports &
Valves
ONGOING
SABIC TERMINAL
SERVICES CO. –
SABTANK
SABIC TERMINAL
SERVICES CO. –
SABTANK
Ammonia Pipe Line
Repair for SAFCO IBB
during Shutdown
Inspection & Replacement of Pipeline from
SAFCO IBB to SABTANK including
Procurement, Fabrication & Installation of
Piping, Supply, Testing & Calibration of
Control & Pressure Safety Valves, Cleaning
of Heat Exchangers etc.
ONGOING
SABIC TERMINAL
SERVICES CO. –
SABTANK
SABIC TERMINAL
SERVICES CO. –
SABTANK
Petrokemya Major
Turnaround Project
Supply of Material (Pipes, Fittings, Valves
etc.), Fabrication, Blasting & Painting of
Pipe Spools, removal of existing Lines,
Installation of Newly fabricated Pipe Spools
& Valves, NDT & Hydro-testing / Precommissioning
of Ethylene Piping System at
SABTANK.
ONGOING
Saudi Chevron Philips (S-Chem)Saudi Chevron Philips (S-Chem)Exchanger bundle Re-Tubing Services for 41E34BRe-Tubing Services covering Supply of
Tube Material (3,510), Inspection, RStamp,
NDT & Hydro-testing of Tubes &
Shell Side at Site
ONGOING

Pipe Fabrication

OWNER NAMECLIENT NAMEPROJECT DESCRIPTIONSCOPE OF WORKSTATUS
SAUDI ARAMCOTecnicas ReunidasSaudi Aramco Ras Tanura Refinery Clean Fuels ProjectCS, LTCS, SS & AS Piping Shop Fabrication work of approx. 685,000 DI from 2” – 78” & Supply & Fabrication of 200 Tons Pipe Supports including Sandblasting & Painting, NDE and Packing & Loading of Finished Spools & Supports to Project Site (Ras Tanura Refinery)UNDER EXECUTION
SAUDI ARAMCOSEPCO Arabia Co.Master Gas System Expansion Project Phase-2 (BGCS#1)CS & SS Piping Shop Fabrication work of approx. 173,000 DI from 3” – 56” including Sandblasting & Painting, NDE and Packing Loading & Transportation of Finished Spools to Project Site (Al-Hassa)UNDER EXECUTION
Ma’aden Phosphate Company (MPC)Ma’aden Phosphate Company (MPC)Modification of Pre-Scrubber VesselReplacement of Damaged Shell Portion of Granulator Pre-Scrubber Vessel 8A61-V06 with 904-L Material including Supply of material & fabrication of Shell for DAP Train-AUNDER EXECUTION
TASNEE Petrochemical ComplexTASNEE Petrochemical ComplexMAPD C3 De-Inventory LineMechanical, Piping & Instrumentation Work covering Supply of Material, Fabrication & Installation of Piping, Pipe Supports, Structural Platform, Cable Trays, Radiography, Blasting & Painting and Insulation & Hydro-testingUNDER EXECUTION
SAUDI ARAMCOBAKER HUGHES – BHGENew Balancing Line Project at Aramco Shaybah PlantSupply of Material, Fabrication of SS Piping including NDT, PMI, Hydro-testing & Transportation of Spool to Project Site.UNDER EXECUTION
SABIC TERMINAL SERVICES CO. – SABTANKSABIC TERMINAL SERVICES CO. – SABTANKPetrokemya Major Turnaround ProjectSupply of Material (Pipes, Fittings, Valves etc.), Fabrication, Blasting & Painting of Pipe Spools, removal of existing Lines, Installation of Newly fabricated Pipe Spools & Valves, NDT & Hydro-testing / Pre-commissioning of Ethylene Piping System at SABTANK.UNDER EXECUTION
SABIC TERMINAL SERVICES CO. – SABTANKSABIC TERMINAL SERVICES CO. – SABTANKAmmonia Pipe Line Repair for SAFCO IBB during ShutdownInspection & Replacement of Pipeline from SAFCO IBB to SABTANK including Procurement, Fabrication & Installation of Piping, Supply, Testing & Calibration of Control & Pressure Safety Valves, Cleaning of Heat Exchangers etc.UNDER EXECUTION

Valves

OWNER NAMECLIENT NAMEPROJECT DESCRIPTIONSCOPE OF WORKSTATUS
Ma’aden Phosphate Company (MPC)Ma’aden Phosphate Company (MPC)Modification of Pre-Scrubber VesselReplacement of Damaged Shell Portion of Granulator Pre-Scrubber Vessel 8A61-V06 with 904-L Material including Supply of material & fabrication of Shell for DAP Train-AUNDER EXECUTION
SABIC TERMINAL SERVICES CO. – SABTANKSABIC TERMINAL SERVICES CO. – SABTANKPetrokemya Major Turnaround ProjectSupply of Material (Pipes, Fittings, Valves etc.), Fabrication, Blasting & Painting of Pipe Spools, removal of existing Lines, Installation of Newly fabricated Pipe Spools & Valves, NDT & Hydro-testing / Pre-commissioning of Ethylene Piping System at SABTANK.UNDER EXECUTION
SABIC TERMINAL SERVICES CO. – SABTANKSABIC TERMINAL SERVICES CO. – SABTANKNorth Piping Circuit ProjectProcurement, Replacement, Repair, Realign & testing of Pipelines, associated Supports & ValvesUNDER EXECUTION
SAUDI ARAMCOSEPCO Arabia CoMaster Gas System Expansion Project Phase-IIOn-site Testing & Calibration Services for instruments & Valves including PSVs, Control Valves, MOVs etc. for Station KMO, BGCS#1, #3 & #5UNDER EXECUTION
SAUDI ARAMCOTecnicas ReunidasSaudi Aramco Fadhili Gas ProjectHydro-testing of Mechanical Valves (3/4″ – 48″) & Instrument Valves (2″ – 30″) at TR Project Site – Total Qty: 5,021UNDER EXECUTION
SAUDI ARAMCOTecnicas ReunidasSaudi Aramco Fadhili Gas Plant ProjectHydro-testing & Inspection of Fire Water Valves 2″ – 16″ at Shop ( 360 Nos. Class 150)UNDER EXECUTION
Saudi Electric Co. – SEC/ GEAbengoa Energia / AbenerWAS Turaif Power Plant ProjectOverhauling, Repair, Maintenance & Testing of 44″ Ball Valves ( CL-300)UNDER EXECUTION