OWNER NAMECLIENT NAMEPROJECT DESCRIPTIONSCOPE OF WORKLOCATION
Tansee Petrochemical ComplexLinde Arabian Contracting Co. LTD.MAPD Hydrogenation ProjectGeneral Construction Work including Est. of Temp. Facilities, Civil, Steel Structure Installation, Mechanical Equipment Erection, Piping Fabrication & Installation, Mechanical Equipment Erection, Piping Fabrication & Installation including Blasting, Painting & Insulation, Passive Fire Protection, E & I and Pre-commissioning & CommissioningJubail
SAUDI ELECTRIC CO. (SEC)GAMA POWER SYSTEMSSEC PP13 Combined Cycle Power Plant Project (1,650 MW)Shop Fabrication of CS, SS & AS Piping (3″ -36″) of 385,000 DI & Supply & Fabrication of 450 Tons Pipe Supports including Sandblasting & Painting, NDE and Packing Loading & Transportation of Finished Spools to Project Site (Riyadh)Dhurma, Riyadh
SAUDI ARAMCOSEPCO Arabia CoMaster Gas System Expansion Project Phase-1 (BGCS#3 & 5)CS & SS Pining Shop Fabrication Work of approx. 192,000 DI from 3″ – 56″ including Sandblasting & Painting, NDE and Packing Loading & Transportation of Finished Spools to Project Site (Riyadh)SA’AD Area, Riyadh
SAUDI ARAMCOSEPCO Arabia Co.Master Gas System Expansion Project Phase-1 (BGCS#3 & 5)Supply of Material, Fabrication, Painting & Galvanizing of 650 Tons Pipe Supports including Transportation to Project Site (Riyadh)SA’AD & Dhurma Area, Riyadh
SAUDI ARAMCOSAUDI ARAMCOSAUDI ARAMCO MARITIME YARD PROJECTEPC Covering Design, Procurement & Construction including Civil, Mechanical, and Supply, Fabrication, Blasting & Painting, Installation & Testing of tank & Pump House interconnecting Fire Water Piping including Supply & commissioning of Fire Water Pumps at Ras Al-KhairRas AL-Khair
SAUDI Aramco Ras Tanura RefineryDragados Gulf Construction Co.Loading Rack Facilities ProjectMechanical Equipment Erection, Piping Fabrication & Erection Work including Tie-ins, insulation of Piping, NDT, Hydro-Testing & Thrust boring Work for Underground Piping and Pre-commissioning & comissioning WorkRas Tanura
SABIC – GASeTEC E&CSADARA O2 & N2 Gas Supply Mega ProjectMechanical & Piping work covering Fabrication & Installation 16 KM Pipeline of 24”,16” & 10”, Sandblasting & Painting, Internal Blasting, and Erection of Equipment covering LIN Storage Tank (116 tons), Compressors (2×35 tons), , Vaporizers, Metering Station & other associated Equipment in Sabic GAS, SADARA & Royal Commission CorridorJubail
Saudi AramcoSaudi AramcoResidential & Industrial Park Development at HawiyahEPC covering Engineering, Procurement & Construction of 12 Nos. of Field Erected Storage Tanks along-with complete interconnecting Piping, Pumping Stations as well as Electrical & Instrumentation and PLC WorkHawiyah
SABIC – HADEED Iron Steel Co.eTEC E&CHadeed Straightening Shop ProjectCivil, Mechanical Equipment Erection and Fabrication & Installation of 2.4 KM 6” Chilled Water Pipeline including painting, insulation as well as commissioning WorkJubail
SABIC – HADEED Iron Steel Co.eTEC E&CConstruction of New Straightening ShopErection of Steel Structure (1400 tons approx.), Pre-Engineered Building, E&I and Construction of Temp Site Facilities WorkJubail
SADARA Petrochemical Co.TEKFEN ConstructionSADARA Polyethylene Oxide Unit 360 ProjectCS & SS aboveground Piping Fabrication & Erection Work on Pipe Racks, Sleepers & around the Equipment including Fabrication & Installation of Pipe Supports in Tank Farm AreaJubail II
Saudi Kayan Petrochemical Co.GE Power & Water Co.SK Waste Water Treatment System Upgrade ProjectFabrication & Assembly of 4 Nos. Skids (16.2 Tons) including FRP Tank, associated Piping, Instruments, LP Panel, Cable Termination as well as hydro testing of tanks & piping.Jubail
SADARA Petrochemical Co.CCE/Tecnimont ArabiaSADARA Tecnimont Train 3 ProjectFabrication & Testing of Stainless Steel Piping Ranging from 4” – 16” including RT and Hydro-testing at 14 Bar pressure Jubail
SAUDI ARMACOMSMS Co.Saudi Aramco Manifa Drain Pit ProjectShop Fabrication & Installation of CS & SS Pipe Spool at Site including NDE & Hydro-testing of Piping & ValvesJubail
SABIC – HADEED Iron Steel CoINBESCO
DANIELI
HADEED Long Product Expansion ProjectCivil Works including Site development & Equipment Foundations Work, Fabrication for Pipe Spools, Pipe Racks Installation, Erection of Steel Structure, Electrical & Fire Water System,
Construction of technological footings, electrical & architectural works
Jubail
Saudi Kayan Petrochemical ComplexSaudi Kayan Petrochemical ComplexPrevention of Crude Oil & COB AreaFabrication & Erection of SS & CS Piping Spools, Instrumentation & Civil Works.Jubail
Saudi Aramco Total Refinery – SATORPNesma & Partners JERP-4 Delayed Coker Project Installation of pipe spools on pipe racks including hydro-test & commissioning assistanceJubail II
SABIC – PetrokemyaMYCELX Technologies CorporationInstallation of Waste Water Treatment PlantCivil Foundations, Mechanical Fabrication & Erection of Pipe Spools, Installation of Equipment, Tanks & Electrical WorksJubail
TASNEE PetrochemicalsTASNEE PetrochemicalsProvision & Installation PumpCivil Works, Excavation, layout, Erecting Steel Frame, Electrical InstallationJubail

 

Shutdown & Specialized Services

OWNER NAMECLIENT NAMEPROJECT DESCRIPTIONSCOPE OF WORKLOCATION
Saudi Basic Industries Corporation – SABICSAUDI KAYAN PETROCHEMICAL COMPEXPHENOLIC Plant Turnaround – 2016Mechanical Services covering Installation/removal of Blinding, Equipment Opening, Clean and Box-up, repair & modification work, Catalyst Unloading/Loading, Exchangers Cleaning, Plugging/Welding of leaked Tubes, Vessels Cleaning, Nozzles Replacement, Patch work on Tank and Piping Modification Work during Shutdown. Total Equipment were 358 included 02 Prilling Towers, 27 Heat Exchangers, 17 Vessels, 20 Column, 4 Reactors, 4 Heaters, 11 Filters & 196 Valves out of which 176 were PSVs.Jubail
Rabec Electric CompanySEPCO III Electric Power Construction Corp.Boiler Modification Works Rabigh IPP ProjecModification of Boiler # 2 Tubes by installing baffle plates, replacement and installation of tube bundle at
40 meter elevation
Rabigh
MA’ADEN Phosphate Co.Dragados Gulf Construction Co.Umm Wu’Al Infrastructure, Utilities & Off-SitesTie-ins Work for 28” LP Steam Line & 20” Sulphuric Acid Line during Shutdown. The scope of work includes cutting, fabrication & installation 28×16 unequal Tee for Steam Line as well 16” stub in joint in Sulphuric Acid Line.Ma’aden
Saudi Aramco Total Refinery – SATORPSaudi Aramco Total Refinery – SATORPSteam ReformersBaroscopic Inspection services of the headers & branches of the Steam Reformer System (Unit 151 & 152)Jubail II
Saudi AramcoRas Tanura Refinery Co.Diesel Hydro-treater (DHT) ReactorsCatalyst loading of two (2) largest Diesel Hydro-treater (DHT) reactors and three (3) SRU ConvertersRas Tanura
SABIC – SADAFDialog Services & PCMCSADAF TA/2014Maintenance & Hydro-jetting Services in SADAF T/A2014Jubail
SIPCHEMSIPCHEMDylim Pipe Line ProjectShutdown & Maintenance WorkJubail
Ma’aden Phosphate Co. (MPC)Ma’aden Phosphate Co. (MPC)Catalyst ReplacementCatalyst Replacement for Desulphurization Reactor (7A10-R02/R02) @ Zinc Oxide catalyst; unloading under NitrogenMa’aden
Saudi Kayan Petrochemical ComplexDaelim E&CHDPE Plant@6 – 10in of @80 spools at Saudi Kayan HDPE PlantJubail
Saudi AramcoKhafji Joint Operation (KJO)Catalyst ServicesCatalyst Replacement of 4 ReactorsKhafji
Saudi AramcoAl AwanCatalyst ServicesProvision of Catalyst Screening & Dry Vacuum Unit Services for Udhaliyah & KJO PlantsUdhaliyah
Saudi Kayan Petrochemical ComplexSaudi Kayan Petrochemical ComplexSaudi Kayan Olefins Project (SKOP)Catalyst Loading of 30 ReactorsJubail
Saudi Kayan Petrochemical ComplexSaudi Kayan Petrochemical ComplexSAUDI KAYAN Phenolic Project (SKPP)Catalyst Loading of 18 reactors for Cumene Plant, Phenolic Plant and BPA PlantJubail
Saudi Kayan Petrochemical ComplexTecnicas ReunidasSAUDI KAYAN SKPP PlantCatalyst Replacement for BPA Guard Bed Reactor including removal and re-installation of Johnson Screen PipesJubail
Chevron Phillips (S-CHEM)Chevron Phillips (S-CHEM)Catalyst ServicesCatalyst loading of all the 39 reactors for the NCP north plot petrochemicals plantJubail
Saudi Kayan Petrochemical ComplexSaudi Kayan Petrochemical ComplexSAUDI KAYAN HDPE PlantCatalyst/Powder loading of 350 tons for Powder ExtruderJubail
TASNEE Petrochemical ComplexTASNEE Petrochemical ComplexCatalyst ServicesCatalyst Replacement under N2 of Poly ReactorJubail
Jubail Chemical Industrial (JANA)Jubail Chemical Industrial (JANA)Catalyst LoadingCatalyst Un-Loading & Loading of Tubular ReactorJubail

 

Valves

OWNER NAMEOWNER NAMEPROJECT DESCRIPTIONSCOPE OF WORKLOCATION
SAUDI ARAMCOSEPCO
Arabia Co.
Master Gas Expansion
Project-Phase-II
On-Site testing & Calibration Services for
Instruments & Valves including PSVs,
Control Valves, MOVs etc. for
Station KM0, BGCS#1, #3 & #5
Al-Hassa
SAUDI ARAMCOTecnicas
Reunidas
Saudi Aramco Fadhili
Gas Project
Hydro Testing of Mechanical Valves (3/4″ –
48″) & Instrument Valves (2″ – 30″) at TR
Project Site – Total Qty: 5,021
Fadhili
SAUDI ARAMCOTecnicas
Reunidas
Saudi Aramco Fadhili
Gas Plant Project
Hydro-testing & Inspection of Fire Water
Valves 2” – 16″ at Shop (360 Nos. Class
150)
Fadhili / Jubail
Saudi Electric Co
– SEC / GE
Abengoa Energia
/ Abener
WAS Turaif Power
Plant Project
Overhauling, Repair, Maintenance &
testing of 44″ Ball Valves (CL-300)
Turaif / Jubail
Saudi Chevron
Philips (S-CHEM)
JAL International
Company LTD
Preventative
Maintenance &
Repair of Sluice Gate
Values during TA
2018
Inspection, Overhauling & Repair &
Maintenance and Testing of 6 Nos. of
Sluice Gate Valves Size 78”
Jubail
MAADEN WA’AD
AL-SHAMAL
PHOSPHATE CO.
(MWSPC)
MAADEN WA’AD
AL-SHAMAL
PHOSPHATE CO.
(MWSPC)
Long Form 2 Years
Contract
Long Term Contract for Maintenance &
Servicing of Repairable Spares Including
Repair, Testing, Calibration & overhauling
of Valves
Turaif
SABIC IBN ZAHRSNC Lavalin –
KENTZ
SABIC IBN ZAHR
PLANT
Hydro-testing of Ball Valves (1-1/2″ – 3″)Jubail
Bana Gas BahrainJGC Gulf
Corporation
CGP Project at
Bahrain
Provision of Certified Engineers &
Technicians for Online Greasing the Spring
cartridges of BIFFI Actuators (21 Nos.)
Bahrain
Saudi Basic
Industries Corp.
(SABIC)
SABIC TERMINAL
SERVICES CO. –
SABTANK
Emergency Shutdown
for PK VCM Coolers
Replacement at
Berth-44
Calibration, Testing, Overhauling & Repair
of Valves (Check Valve, Gate Valve, Globe
Valve, Ball Valve of Cl-150 to Cl-600) and
Pressure Safety Valves at Workshop and
Field Installation during the Emergency
Shutdown (Total 93
from 0.5” – 12”)
Jubail
Marafiq – Saur
(MASA)
Marafiq – Saur
(MASA)
Refurbishment of
700mm Butterfly
Valves (2 Nos.)
Removal, Repair, Testing (Hydro) &
Refurbishment including fabrication &
replacement of seat, gasket, damaged
fastener etc. of 700 mm Butterfly Valves
at Workshop
Jubail
SABIC TERMINAL
SERVICES CO. –
SABTANK
SABIC TERMINAL
SERVICES CO. –
SABTANK
Emergency Shutdown
for PK Ethylene SS
Pipeline Replacement
Supply, Testing, Calibration & Installation
of New SS Valves (Gate Valves from 1/4” –
2” with 800# Class)
Jubail
Saudi Basic
Industries
Corporation –
SABIC
SAUDI KAYAN
PETROCHEMICAL
COMPLEX
PHENOLIC Plant
Turnaround – 2016
Removal, Testing / Inspection &
Reinstallation of 196 Valves including 176
PSVs along-with Mechanical Maintenance
work during the Major Plant Shutdown
Jubail
ARAMCO –
Hawyiah Plant
ARAMCO –
Hawyiah Plant
Online Servicing of
MOVs at Aramco
HGP
Online Flushing, Greasing and Applying
Sealant For 6 Nos. of MOVs Valves of size
30″ Class- 300# AT GT#1 AREA at Aramco
HAWIYAH Gas Plant
Hawiyah
SABIC TERMINAL
SERVICES CO. –
SABTANK
SABIC TERMINAL
SERVICES CO. –
SABTANK
Emergency Shutdown
Of
Ammonia Pipeline
Repair for SAFCO IBB
Supply, Testing, Calibration, Overhauling
& Installation of Gate Valves, Check
Valves, Globe Valves & Control Valves of
CS & SS Material from 1½” to 18” Size
with grading of Cl-150 to Cl-600 & Cl-800
Including Testing & Calibration of PSVs
from ¾” to 1” Size (Total 228 Valves)
Jubail