General Construction
OWNER NAME | CLIENT NAME | PROJECT DESCRIPTION | SCOPE OF WORK | LOCATION |
---|---|---|---|---|
Tansee Petrochemical Complex | Linde Arabian Contracting Co. LTD. | MAPD Hydrogenation Project | General Construction Work including Est. of Temp. Facilities, Civil, Steel Structure Installation, Mechanical Equipment Erection, Piping Fabrication & Installation, Mechanical Equipment Erection, Piping Fabrication & Installation including Blasting, Painting & Insulation, Passive Fire Protection, E & I and Pre-commissioning & Commissioning | Jubail |
SAUDI ELECTRIC CO. (SEC) | GAMA POWER SYSTEMS | SEC PP13 Combined Cycle Power Plant Project (1,650 MW) | Shop Fabrication of CS, SS & AS Piping (3″ -36″) of 385,000 DI & Supply & Fabrication of 450 Tons Pipe Supports including Sandblasting & Painting, NDE and Packing Loading & Transportation of Finished Spools to Project Site (Riyadh) | Dhurma, Riyadh |
SAUDI ARAMCO | SEPCO Arabia Co | Master Gas System Expansion Project Phase-1 (BGCS#3 & 5) | CS & SS Pining Shop Fabrication Work of approx. 192,000 DI from 3″ – 56″ including Sandblasting & Painting, NDE and Packing Loading & Transportation of Finished Spools to Project Site (Riyadh) | SA’AD Area, Riyadh |
SAUDI ARAMCO | SEPCO Arabia Co. | Master Gas System Expansion Project Phase-1 (BGCS#3 & 5) | Supply of Material, Fabrication, Painting & Galvanizing of 650 Tons Pipe Supports including Transportation to Project Site (Riyadh) | SA’AD & Dhurma Area, Riyadh |
SAUDI ARAMCO | SAUDI ARAMCO | SAUDI ARAMCO MARITIME YARD PROJECT | EPC Covering Design, Procurement & Construction including Civil, Mechanical, and Supply, Fabrication, Blasting & Painting, Installation & Testing of tank & Pump House interconnecting Fire Water Piping including Supply & commissioning of Fire Water Pumps at Ras Al-Khair | Ras AL-Khair |
SAUDI Aramco Ras Tanura Refinery | Dragados Gulf Construction Co. | Loading Rack Facilities Project | Mechanical Equipment Erection, Piping Fabrication & Erection Work including Tie-ins, insulation of Piping, NDT, Hydro-Testing & Thrust boring Work for Underground Piping and Pre-commissioning & comissioning Work | Ras Tanura |
SABIC – GAS | eTEC E&C | SADARA O2 & N2 Gas Supply Mega Project | Mechanical & Piping work covering Fabrication & Installation 16 KM Pipeline of 24”,16” & 10”, Sandblasting & Painting, Internal Blasting, and Erection of Equipment covering LIN Storage Tank (116 tons), Compressors (2×35 tons), , Vaporizers, Metering Station & other associated Equipment in Sabic GAS, SADARA & Royal Commission Corridor | Jubail |
Saudi Aramco | Saudi Aramco | Residential & Industrial Park Development at Hawiyah | EPC covering Engineering, Procurement & Construction of 12 Nos. of Field Erected Storage Tanks along-with complete interconnecting Piping, Pumping Stations as well as Electrical & Instrumentation and PLC Work | Hawiyah |
SABIC – HADEED Iron Steel Co. | eTEC E&C | Hadeed Straightening Shop Project | Civil, Mechanical Equipment Erection and Fabrication & Installation of 2.4 KM 6” Chilled Water Pipeline including painting, insulation as well as commissioning Work | Jubail |
SABIC – HADEED Iron Steel Co. | eTEC E&C | Construction of New Straightening Shop | Erection of Steel Structure (1400 tons approx.), Pre-Engineered Building, E&I and Construction of Temp Site Facilities Work | Jubail |
SADARA Petrochemical Co. | TEKFEN Construction | SADARA Polyethylene Oxide Unit 360 Project | CS & SS aboveground Piping Fabrication & Erection Work on Pipe Racks, Sleepers & around the Equipment including Fabrication & Installation of Pipe Supports in Tank Farm Area | Jubail II |
Saudi Kayan Petrochemical Co. | GE Power & Water Co. | SK Waste Water Treatment System Upgrade Project | Fabrication & Assembly of 4 Nos. Skids (16.2 Tons) including FRP Tank, associated Piping, Instruments, LP Panel, Cable Termination as well as hydro testing of tanks & piping. | Jubail |
SADARA Petrochemical Co. | CCE/Tecnimont Arabia | SADARA Tecnimont Train 3 Project | Fabrication & Testing of Stainless Steel Piping Ranging from 4” – 16” including RT and Hydro-testing at 14 Bar pressure | Jubail |
SAUDI ARMACO | MSMS Co. | Saudi Aramco Manifa Drain Pit Project | Shop Fabrication & Installation of CS & SS Pipe Spool at Site including NDE & Hydro-testing of Piping & Valves | Jubail |
SABIC – HADEED Iron Steel Co | INBESCO DANIELI | HADEED Long Product Expansion Project | Civil Works including Site development & Equipment Foundations Work, Fabrication for Pipe Spools, Pipe Racks Installation, Erection of Steel Structure, Electrical & Fire Water System, Construction of technological footings, electrical & architectural works | Jubail |
Saudi Kayan Petrochemical Complex | Saudi Kayan Petrochemical Complex | Prevention of Crude Oil & COB Area | Fabrication & Erection of SS & CS Piping Spools, Instrumentation & Civil Works. | Jubail |
Saudi Aramco Total Refinery – SATORP | Nesma & Partners | JERP-4 Delayed Coker Project | Installation of pipe spools on pipe racks including hydro-test & commissioning assistance | Jubail II |
SABIC – Petrokemya | MYCELX Technologies Corporation | Installation of Waste Water Treatment Plant | Civil Foundations, Mechanical Fabrication & Erection of Pipe Spools, Installation of Equipment, Tanks & Electrical Works | Jubail |
TASNEE Petrochemicals | TASNEE Petrochemicals | Provision & Installation Pump | Civil Works, Excavation, layout, Erecting Steel Frame, Electrical Installation | Jubail |
Shutdown & Specialized Services
OWNER NAME | CLIENT NAME | PROJECT DESCRIPTION | SCOPE OF WORK | LOCATION |
---|---|---|---|---|
Saudi Basic Industries Corporation – SABIC | SAUDI KAYAN PETROCHEMICAL COMPEX | PHENOLIC Plant Turnaround – 2016 | Mechanical Services covering Installation/removal of Blinding, Equipment Opening, Clean and Box-up, repair & modification work, Catalyst Unloading/Loading, Exchangers Cleaning, Plugging/Welding of leaked Tubes, Vessels Cleaning, Nozzles Replacement, Patch work on Tank and Piping Modification Work during Shutdown. Total Equipment were 358 included 02 Prilling Towers, 27 Heat Exchangers, 17 Vessels, 20 Column, 4 Reactors, 4 Heaters, 11 Filters & 196 Valves out of which 176 were PSVs. | Jubail |
Rabec Electric Company | SEPCO III Electric Power Construction Corp. | Boiler Modification Works Rabigh IPP Projec | Modification of Boiler # 2 Tubes by installing baffle plates, replacement and installation of tube bundle at 40 meter elevation | Rabigh |
MA’ADEN Phosphate Co. | Dragados Gulf Construction Co. | Umm Wu’Al Infrastructure, Utilities & Off-Sites | Tie-ins Work for 28” LP Steam Line & 20” Sulphuric Acid Line during Shutdown. The scope of work includes cutting, fabrication & installation 28×16 unequal Tee for Steam Line as well 16” stub in joint in Sulphuric Acid Line. | Ma’aden |
Saudi Aramco Total Refinery – SATORP | Saudi Aramco Total Refinery – SATORP | Steam Reformers | Baroscopic Inspection services of the headers & branches of the Steam Reformer System (Unit 151 & 152) | Jubail II |
Saudi Aramco | Ras Tanura Refinery Co. | Diesel Hydro-treater (DHT) Reactors | Catalyst loading of two (2) largest Diesel Hydro-treater (DHT) reactors and three (3) SRU Converters | Ras Tanura |
SABIC – SADAF | Dialog Services & PCMC | SADAF TA/2014 | Maintenance & Hydro-jetting Services in SADAF T/A2014 | Jubail |
SIPCHEM | SIPCHEM | Dylim Pipe Line Project | Shutdown & Maintenance Work | Jubail |
Ma’aden Phosphate Co. (MPC) | Ma’aden Phosphate Co. (MPC) | Catalyst Replacement | Catalyst Replacement for Desulphurization Reactor (7A10-R02/R02) @ Zinc Oxide catalyst; unloading under Nitrogen | Ma’aden |
Saudi Kayan Petrochemical Complex | Daelim E&C | HDPE Plant | @6 – 10in of @80 spools at Saudi Kayan HDPE Plant | Jubail |
Saudi Aramco | Khafji Joint Operation (KJO) | Catalyst Services | Catalyst Replacement of 4 Reactors | Khafji |
Saudi Aramco | Al Awan | Catalyst Services | Provision of Catalyst Screening & Dry Vacuum Unit Services for Udhaliyah & KJO Plants | Udhaliyah |
Saudi Kayan Petrochemical Complex | Saudi Kayan Petrochemical Complex | Saudi Kayan Olefins Project (SKOP) | Catalyst Loading of 30 Reactors | Jubail |
Saudi Kayan Petrochemical Complex | Saudi Kayan Petrochemical Complex | SAUDI KAYAN Phenolic Project (SKPP) | Catalyst Loading of 18 reactors for Cumene Plant, Phenolic Plant and BPA Plant | Jubail |
Saudi Kayan Petrochemical Complex | Tecnicas Reunidas | SAUDI KAYAN SKPP Plant | Catalyst Replacement for BPA Guard Bed Reactor including removal and re-installation of Johnson Screen Pipes | Jubail |
Chevron Phillips (S-CHEM) | Chevron Phillips (S-CHEM) | Catalyst Services | Catalyst loading of all the 39 reactors for the NCP north plot petrochemicals plant | Jubail |
Saudi Kayan Petrochemical Complex | Saudi Kayan Petrochemical Complex | SAUDI KAYAN HDPE Plant | Catalyst/Powder loading of 350 tons for Powder Extruder | Jubail |
TASNEE Petrochemical Complex | TASNEE Petrochemical Complex | Catalyst Services | Catalyst Replacement under N2 of Poly Reactor | Jubail |
Jubail Chemical Industrial (JANA) | Jubail Chemical Industrial (JANA) | Catalyst Loading | Catalyst Un-Loading & Loading of Tubular Reactor | Jubail |
Valves
OWNER NAME | OWNER NAME | PROJECT DESCRIPTION | SCOPE OF WORK | LOCATION |
---|---|---|---|---|
SAUDI ARAMCO | SEPCO Arabia Co. | Master Gas Expansion Project-Phase-II | On-Site testing & Calibration Services for Instruments & Valves including PSVs, Control Valves, MOVs etc. for Station KM0, BGCS#1, #3 & #5 | Al-Hassa |
SAUDI ARAMCO | Tecnicas Reunidas | Saudi Aramco Fadhili Gas Project | Hydro Testing of Mechanical Valves (3/4″ – 48″) & Instrument Valves (2″ – 30″) at TR Project Site – Total Qty: 5,021 | Fadhili |
SAUDI ARAMCO | Tecnicas Reunidas | Saudi Aramco Fadhili Gas Plant Project | Hydro-testing & Inspection of Fire Water Valves 2” – 16″ at Shop (360 Nos. Class 150) | Fadhili / Jubail |
Saudi Electric Co – SEC / GE | Abengoa Energia / Abener | WAS Turaif Power Plant Project | Overhauling, Repair, Maintenance & testing of 44″ Ball Valves (CL-300) | Turaif / Jubail |
Saudi Chevron Philips (S-CHEM) | JAL International Company LTD | Preventative Maintenance & Repair of Sluice Gate Values during TA 2018 | Inspection, Overhauling & Repair & Maintenance and Testing of 6 Nos. of Sluice Gate Valves Size 78” | Jubail |
MAADEN WA’AD AL-SHAMAL PHOSPHATE CO. (MWSPC) | MAADEN WA’AD AL-SHAMAL PHOSPHATE CO. (MWSPC) | Long Form 2 Years Contract | Long Term Contract for Maintenance & Servicing of Repairable Spares Including Repair, Testing, Calibration & overhauling of Valves | Turaif |
SABIC IBN ZAHR | SNC Lavalin – KENTZ | SABIC IBN ZAHR PLANT | Hydro-testing of Ball Valves (1-1/2″ – 3″) | Jubail |
Bana Gas Bahrain | JGC Gulf Corporation | CGP Project at Bahrain | Provision of Certified Engineers & Technicians for Online Greasing the Spring cartridges of BIFFI Actuators (21 Nos.) | Bahrain |
Saudi Basic Industries Corp. (SABIC) | SABIC TERMINAL SERVICES CO. – SABTANK | Emergency Shutdown for PK VCM Coolers Replacement at Berth-44 | Calibration, Testing, Overhauling & Repair of Valves (Check Valve, Gate Valve, Globe Valve, Ball Valve of Cl-150 to Cl-600) and Pressure Safety Valves at Workshop and Field Installation during the Emergency Shutdown (Total 93 from 0.5” – 12”) | Jubail |
Marafiq – Saur (MASA) | Marafiq – Saur (MASA) | Refurbishment of 700mm Butterfly Valves (2 Nos.) | Removal, Repair, Testing (Hydro) & Refurbishment including fabrication & replacement of seat, gasket, damaged fastener etc. of 700 mm Butterfly Valves at Workshop | Jubail |
SABIC TERMINAL SERVICES CO. – SABTANK | SABIC TERMINAL SERVICES CO. – SABTANK | Emergency Shutdown for PK Ethylene SS Pipeline Replacement | Supply, Testing, Calibration & Installation of New SS Valves (Gate Valves from 1/4” – 2” with 800# Class) | Jubail |
Saudi Basic Industries Corporation – SABIC | SAUDI KAYAN PETROCHEMICAL COMPLEX | PHENOLIC Plant Turnaround – 2016 | Removal, Testing / Inspection & Reinstallation of 196 Valves including 176 PSVs along-with Mechanical Maintenance work during the Major Plant Shutdown | Jubail |
ARAMCO – Hawyiah Plant | ARAMCO – Hawyiah Plant | Online Servicing of MOVs at Aramco HGP | Online Flushing, Greasing and Applying Sealant For 6 Nos. of MOVs Valves of size 30″ Class- 300# AT GT#1 AREA at Aramco HAWIYAH Gas Plant | Hawiyah |
SABIC TERMINAL SERVICES CO. – SABTANK | SABIC TERMINAL SERVICES CO. – SABTANK | Emergency Shutdown Of Ammonia Pipeline Repair for SAFCO IBB | Supply, Testing, Calibration, Overhauling & Installation of Gate Valves, Check Valves, Globe Valves & Control Valves of CS & SS Material from 1½” to 18” Size with grading of Cl-150 to Cl-600 & Cl-800 Including Testing & Calibration of PSVs from ¾” to 1” Size (Total 228 Valves) | Jubail |